Project work packages are typically decomposed into smaller components called activities t
A.reviewing
B.estimating
C.auditing
D.expecting
A.reviewing
B.estimating
C.auditing
D.expecting
(71)
A. project elements
B. work drafts
C. work package
D. project deliverables
(75)
A.independent resource
B.individual work load
C.work milestone
D.work package
(71)
A. project elements
B. work drafts
C. work package
D. project deliverables
An example of scope verification is __(73)__ .
A.review the performance of an installed software module
B.managing changes to the project schedule
C.decomposing the WBS to a work package level
D.performing a benefit/cost analysis to determine if we should proceed with the project
A.Package library files(*.pkg)
B.Protel Design Files(*.ddb)
C.Project files(*.prj)
D.PCB Library files(*.lib)
This()is the work defined at the lowest level of the WBS for which cost and duration can be estimated and managed.
A、activity
B、planning package
C、work package
D、requirement
Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
A.Integration
B.Scope
C.Configuration
D.Requirement
The creation of a work breakdown structure (WBS) is the process of______the major project deliverables.
A.subdividing
B.assessing
C.planning
D.integrating
The project () processes include: develop project charter, develop project management plan,direct and manage project work,manage project knowledge,monitor and control project work,perform. integrated change control and close project or phase.
A、integration management
B、scope management
C、schedule management
D、resource management
(75)
A. planning element
B.work package
C.subtask
D. working interface
A.Product scope description
B.Project objectives
C.Stakeholder Analysis
D.The project scope statement