Since they did not prepare well, the meeting was badly ()and some students left before it was over.
A.organized
B.organization
C.organizing
D.organ
A.organized
B.organization
C.organizing
D.organ
Due to a constantly __(66)__ environment, a poor understanding of the user’s needs and preferences, as well as a __(67)__ of willingness to modify __(68)__ organizational structures and decision models, the full economic potential of Web Information Systems (WIS) has not been realized by now. The data object types of the __(69)__ meta. model, the Extended World Wide Web Design Technique (eW3DT), provide hypertext designers __(70)__ a conceptual, user-centric framework and graphical notation for the construction of both, __(71)__ and customized models, during the software development __(72)__ of commercial WIS. A reference model as a normative concept represents an abstraction of a __(73)__ company, its functional units, or its (Web) Information Systems and is intended to streamline the design and implementation of complex applications at __(74)__ costs. As precondition for pursuing a partial globalization strategy, eW3DT __(75)__ between technical and content-specific responsibilities for designing, implementing, and maintaining WIS.
(66)
A. modify
B. changing
C. modifying
D. changed
(67)
A. lack
B. since
C. big
D. lot
(68)
A. existing
B. the
C. fact
D. company
(69)
A. give
B. above
C. presented
D. got
(70)
A. of
B. in
C. to
D. with
(71)
A. exam
B. test
C. reference
D. specialize
(72)
A. process
B. procedure
C. model
D. project
(73)
A. general
B. common
C. typical
D. special
(74)
A. conducted
B. increased
C. reduced
D. deducted
(75)
A. gives
B. distinguishes
C. has
D. differences
An air waybill has been effective ever since the moment when the consignor(or agent)and the carrier(or agent)give the signature after the waybill is filled.()
Since risk is associated with most projects,the best course of action is to ()
A.cover all project risks by buying appropriate insurance
B.ignore the risks,since nothing can be done about them and move forward with the project in an expeditious manner
C.avoid project with clear and present risk
D.identify various risks and implement actions to mitigate their potential impact
The project (73) is a key input to quality planning since it documents major project deliverables,the project objectives that serve to define important stakeholder requirements,thresholds,and acceptance criteria.
A.work performance information
B.change requests
C.scope statement
D.process analysis
A.because
B.although
C.for example
D.since
Since() were used in the cargo.a Phytosanitary Certificate should be provided
A.wooden packages
B.cartons
C.plastic packages
D.jumbo bags
Textile business has become more and more difficult()the competition grew.
A. as
B. befor
C. since
D. after