首页 > 通信工程师
题目内容 (请给出正确答案)
[单选题]

()it is you’ve found, you must give it back to the person it belongs to.

A.That

B.What

C.Whatever

D.However

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“()it is you’ve found, yo…”相关的问题
第1题
● You are a project manager for a small project. Your project was budgeted for ¥500,000 ov
er a six-week period. As of today, you've spent ¥260,000 of your budget to complete work that you originally expected to cost ¥280,000. According to your schedule, you should have spent ¥300,000 by this point. Based on these circumstances, your project could be BEST described as (74) .

(74)

A.Ahead of schedule

B.Behind schedule

C.On schedule

D.Having not enough information provided

点击查看答案
第2题
You are a project manager for a small project. Your project was budgeted for ¥500,000 over
a six-week perio.As of today, you've spent ¥260,000 of your budget to complete work that you originally expected to cost ¥280,000. According to your schedule, you should have spent ¥300,000 by this point. Based on these circumstances, your project could be BEST described as (74) .

A.Ahead of schedule

B.Behind schedule

C.On schedule

D.Having not enough information provided

点击查看答案
第3题
●Ravi, like many project (71) ,had studied the waterfall model of software development as

●Ravi, like many project (71) ,had studied the waterfall model of software development as the primary software life-cycle (72) .He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice.To be the most suitable, an existing process must be. (75) to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

(71) A. customers B.managers C.users D.administrators

(72) A.activity B.procedure C.process D. progress

(73) A.parts B.modules C.software D.a whole

(74) A.parts B.modules C.software D.a whole

(75) A.modified B.used C.suited D. tailored

点击查看答案
第4题
Outgoing Letter Beijing, November 5, 1000 Dear Sirs, Thank you for your enquiry of Oct

Outgoing Letter

Beijing, November 5, 1000

Dear Sirs,

Thank you for your enquiry of October 30 for Women's Nylon Garments. In compliance with your request, we have enclosed a price list and an illustrated brochure. Although we still have certain amount of stock we can hardly keep them for a long time because of the heavy demand. Samples will be sent on request. We are looking forward to our early reply. Yours faithfully,

Beijing Garments Imp/Exp. Corporation

(2) Incoming Letter

Dear sirs,

Many thanks for your quotation of November 5 and the samples of Women's Nylon Garments. We are satisfied with the quality and pleased to enclose our Order NO. 333 for 3 sizes mentioned in your latest catalogue. We note that you can supply these items from stock and hope you will send them before December 31. Our company will reserve the right to cancel this order or reject the goods for any late arrival. For your reference, we with to effect payment by D/P 60 days. Please kindly let us have your confirmation.

ORDER

NO. 333

Beijing Garments Imp/Exp. Corp.

Beijing, China

Please supply the following items:

Quantity (Doz) Item Size Unit Price (Per doz) CIF London

15 Women's Nylon Garments Small US$75.00

16 ditto Medium US$110.00

14 ditto Large US$150.00

London Trading Co. Ltd.

(3) Outgoing Letter

Dear Sirs,

We've received your letter of November 13 and your Order No. 333. Much to our regret, we can hardly accept your order at the prices you bid since the prices of raw materials have increased recently. We're afraid the best we can do is as follows:

Commodity Unit Price (Per doz) CIF London Size Quantity(doz)

Woman`s Nylon Garments USD80.00 Small 15

Woman`s Nylon Garments USD120.00 Medium 16

Woman`s Nylon Garments USD160.00 Large 14

As to payment terms, we usually require letters of credit. However, in view of our long and pleasant relations, we will accept D/P 60 days this time. But it must be clearly understood that, in so doing, we are not establishing a precedent. We hope you will accept our prices and give us a reply an soon as possible.

Yours faithfully,

(4) Incoming Letter

Dear Sirs,

Your letter of November 20,1999 has been received. As we are anxious to finalize this transaction, we have been exerting ourselves to persuade our clients to accept your prices. Eventually, they have decided to accept. We are glad to have been able to conclude the business with you and await your sales confirmation.

Yours faithfully,

5) Outgoing Letter

Dear Sirs,

We're glad that your clients have accepted our prices, which are narrowly calculated. These goods will be packed in boxes of half dozen each and 10 dozen to a carton, and shipped in December from China port to London with transshipment and partial shipments allowed. Insurance is to be covered by us against ALL Risks and War Risk for 100% of the invoice value. Enclosed is our Sales Contract No.116 signed in Beijing on 28th November, 1999 in duplicate, a copy of which please sign and return.

Yours faithfully,

CONTRACT

No.______________

SELLERS:

BUYERS:

This Contract is made by and between the Buyers and the Sellers, whereby the Buyers agree to buy and the Sellers agree to sell the under - mentioned commodity according to the terms and conditions stipulated below:

Commodity Size Quantity (doz) Price per doz CIF London Amount

Total Value:

Packing:

Shipping Mark:

Insurance:

Time of Shipment:

Port of Shipment:

Port of Destination:

Terms of Payment:

Done and signed in on this day of

点击查看答案
第5题
We’ve arranged our schedule()any trouble.A.noB.inC./D.without

We’ve arranged our schedule()any trouble.

A.no

B.in

C./

D.without

点击查看答案
第6题
I found()important to learn English well. A.itB.thatC.it is D.this

I found()important to learn English well.

A.it

B.that

C.it is

D.this

点击查看答案
第7题
i’ve lost my interest()physics.a.in b.0n c.at d.for

i’ve lost my interest()physics.

a.in

b.0n

c.at

d.for

点击查看答案
第8题
Which of the following statements is unlikely to be found on a foul bill of lading____?A.i

Which of the following statements is unlikely to be found on a foul bill of lading____?

A.insufficient packing

B.missing safety seal

C.two cartons short

D.apparent good order and condition

点击查看答案
第9题
A..T.B.FOUND()C..F.D.FCOUND()

A..T.

B.FOUND()

C..F.

D.FCOUND()

点击查看答案
第10题
以下是替换字符串中制定字符的函数过程:Function sReplace (SearchLine As String,SearchFor As

以下是替换字符串中制定字符的函数过程: Function sReplace (SearchLine As String,SearchFor As String,Replace With As String) As String Dim vSearchLine As String,found As Integer found=InStr (SearchLine,SearchFor):vSearchLine=SearchLine If found <>0 Then vSearchLine=" " If found>1 Then vSearchLine=Left (SearchLine,found -1) vSearchLine=vSearchLine+ReplaceWith End If If(表达式)<Len(SearchLine)Then vSearchLine=vSearchLine+Rights (SearchLine,Len (SearchLine) ―found―Len(SearchFor)+1) End If End If sReplace=vSeachLine End Function过程中的“表达式”应为()。

A.found

B.found-1

C.found+Len(SearchFor)

D.found+Len(SearchFor)-1

点击查看答案
第11题
AFTER UNPACKING THE CASE FOUND THAT THE GOODS DID NOT ____WITH THE ORIGINAL SAMPLE.A.MA

AFTER UNPACKING THE CASE FOUND THAT THE GOODS DID NOT ____WITH THE ORIGINAL SAMPLE.

A.MATCH

B.COME UP

C.AGREE

D.MEASURE

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码